Level A
Project period : <6months
Tooled part qty : <10pcs
Automation requirements : no
Tooling complexity levels : low
Brand new assembly process qty : 0
Brand new secondary processing qty : 0
Level B
Project period : 6~9months
Tooled part qty : 10~15pcs
Automation requirements : partial
Tooling complexity levels : middle
Brand new assembly process qty : <2
Brand new secondary processing qty : <2
Level C
Project period : 9~>12months
Tooled part qty : >15pcs
Automation requirements : full
Tooling complexity levels : high
Brand new assembly process qty : >2
Brand new secondary processing qty : >2
Total:
$0
Required services
Project management
Project Milestones
Project planning and execution
Project budgeting for reference
Project review by stage
Design review by stage
Monthly actual spending vs. budget plan review
Monthly Unit cost review
Identify, quantify and escalate project risks
Identify potential contract manufacturer
Review and sign Manufacturing service agreement with CM
Build plan creation and update
Engineering sample build coordination
Engineering verification build coordination
Design validation build coordination
Production validation build coordination
Production sustaining
Customer specific DOE coordination
System
Design product definition
ME
Industry design
Color/material/Finish definition
3D CAD file creation and update
2D drawing creation and update
BOM creation and update
Tolerance analysis
EE
Electrical schematic creation and update
ECAD library creation and update for all EE parts
Electrical layout creation and update
Electrical BOM creation and update
Panel drawing creation and update
RF/antenna design and improvement
Electrical design verification
EE debugging/troubleshooting
Manufacturing build support
Failure analysis/root cause/corrective actions
Acoustic
Acoustic solution recommendation
Acoustic component selection and verification
Tailor the work of Mechanical and Acoustic
Optic
Optical solution recommendation
Optical component selection and verification
Tailor the work of Mechanical and Optic
Validation & Certification
Unique reliability test equipment/fixture definition
Unique reliability test equipment/fixture quotation
Product reliability test plan
Product reliability test plan quotation
Product reliability test execution
Product safety and certification test plan
Product safety and certification test quotation
Product safety and certification test execution
Product compliance test plan
Product compliance test plan quotation
Product compliance test execution
FATP
Final assembly, Test&Pack process development
Line capacity calculation
Manufacturing test plan
Unique test equipment selection
Manufacturing test solution quotation -Hardware fabrication-optional -Script development-optional -Hardware and Script integration and debugging-optional -System solution(hardware, software and integration)-optional
Manufacturing test station fabrication supervising
Manufacturing test station installing and debugging
Manufacturing test station Qualification(Cpk and GR&R)
Manufacturing DFM review
Unique assembly equipment selection
Assembling tolerance analysis report
Manufacturing assembly&fixture equipment quotation
Manufacturing assembly fixture fabrication supervising
Manufacturing assembly station installing and debugging
Manufacturing assembly station qualification(Cpk and GR&R)
Package design
Packing vendor selection
Packing fixture quotation
Packing fixture fabrication supervising
Packing fixture installing and debugging
Packing line qualification
Quality
Quality plan creation and update
Cosmetic inspection criterion creation and update
CMF approval
Quality control
Yield rate reporting
Open issue tracking
Tooling & Molding
Tooling capacity calculation
Tooling quotation
Tooling DFM review
Tooling fabrication supervising
Manufacturing test station Qualification(Cpk and GR&R)
Tooling fabrication tracking/modification review
Molding supervising
SQE
New supplier qualification
Supplier quality management
Tooled parts qualification(First article inspection and Cpk)
Supply Chain
Supplier development -Work with supplier base to validate those suppliers have high confidence capability to produce components with required features and quality throughout the product lifecycle
Purchasing
Ramp up plan creation and update
Production execution supervising
Support
Generate MES(Manufacturing execution system) solution
MES system quotation
MES system installing and debugging
MES system qualification
Design change record and execution
BOM and drawing revision control
Logistic solution